https://equityhighrise.com/wp-content/uploads/2020/07/Modern-Castal-Living.jpg

CASE STUDYHendrix PB

With just thirteen exclusive residences, what was once a dilapidated 720 sq. ft. house built in the 1930s, the Hendrix Pacific Beach is being developed into a one of a kind modern apartment building. From the moment you step into our luxuriously appointed homes, you'll see that every aspect of our architecture, design, and living space has been thoughtfully considered to create a beautiful space you will love to live in - from the expansive windows to the finely appointed fixtures and finishes.

• 1 Minute walk to Trader Joe’s
• 1 Minute walk to Multiple Gyms & CorePower Yoga
• 2 Minute walk to Starbucks and Better Buzz
• 10 Minute Walk to Pacific Beach, Boardwalk & Crystal Pier
• 7 Minute walk to Mission Bay

The Hendrix PB is the only coastal development permit approved to include affordable housing in Pacific Beach since 2017
0123456789001234567890UNITS BY-RIGHT
0123456789001234567890UNITS PERMITTED
0123456789001234567890UNIT POTENTIAL
01234567890012345678900123456789001234567890FT2 LOT
01234567890012345678900123456789001234567890FT2 GROSS FLOOR AREA
01234567890012345678900123456789001234567890FT2 NET RENTABLE

PLANNING AND DEVELOPMENTProject Plan

PLANNING AND DEVELOPMENTProject Plan

YEAR 2019

Identification & Underwriting: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Property-Identification-768x391.jpg

Acquisition: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Property-at-acquisition-768x404.jpg
https://equityhighrise.com/wp-content/uploads/2020/07/Property-at-acquisition-2-768x404.jpg

Design Development: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Design-Development-2-768x423.jpg

Community Approval: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Community-Review-768x576.jpg

Construction Permit Approval: In-Process

https://equityhighrise.com/wp-content/uploads/2020/07/Construction-Permit-Submittal-768x512.jpg
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

YEAR 2021

Coastal Commission Approval: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/California-Coastal-Commission-Submission-768x542.jpg

Housing Commission Approval: In Process

https://equityhighrise.com/wp-content/uploads/2020/07/san-diego-housing-commission-768x310.jpg

Demolition: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Coastal-Development-768x576.jpg

Grading: Completed

https://equityhighrise.com/wp-content/uploads/2020/07/grading-768x576.jpg

Building Permits: In Process

https://equityhighrise.com/wp-content/uploads/2020/07/Construction-Permits-768x576.jpg
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

YEAR 2022

Project Completed

https://equityhighrise.com/wp-content/uploads/2020/07/Ingraham-Renderings-Night-768x432.jpg
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

Flexi Payment Plan

A buyer has to pay 10-15 percent of the total cost of the property at the time of booking and the remaining 80 percent of the amount within 60 days of booking.
DOWNPAYMENT
0123456789001234567890                     %
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Donec mollis.
FIRST HALF
0123456789001234567890                     %
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Donec mollis.
SECOND HALF
0123456789001234567890                     %
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Donec mollis.

Frequently Asked Questions

01What is the first step of the home buying process?

Leverage agile frameworks to provide a robust synopsis for high level overviews. Iterative approaches to corporate strategy foster collaborative thinking to further the overall value proposition. Organically grow the holistic world view of disruptive innovation via workplace diversity and empowerment.

02How much do I need for down payment?

Bring to the table win-win survival strategies to ensure proactive domination. At the end of the day, going forward, a new normal that has evolved from generation X is on the runway heading towards a streamlined cloud solution. User generated content in real-time will have multiple touchpoints for offshoring.

03What kind of credit score do I need to buy a home?

Capitalize on low hanging fruit to identify a ballpark value added activity to beta test. Override the digital divide with additional clickthroughs from DevOps. Nanotechnology immersion along the information highway will close the loop on focusing solely on the bottom line.

Contact us for more details

Contact us for more details

https://equityhighrise.com/wp-content/uploads/2020/07/Equity-Highrise-Crest-Only.png
5580 La Jolla Blvd, Suite 402, La Jolla, CA 92037

Follow us:

CALL US

Ground-up Entitlement & Development

© Equity Highrise Inc